PSE&G Security Upgrades
Location
Hancocks Bridge, New Jersey
Project Size
1.6 mile
JINGOLI fast-tracked the project's security upgrades required by the NRC at the Salem/Hope Creek Nuclear Plants in Hancock’s Bridge, NJ. The project included:
- Installation of a 1.6 mile concrete vehicle barrier, 3.5’ high by 10’ wide. Over a mile was cast-in- place and removable precast concrete blocks were used for the balance.
- Installation of nine new ballistic resistant guard towers, and relocation of others.
- Installation of 10,000 feet of razor security fence, including underground conduits and wiring necessary to install the associated intruder detection systems, microwaves, cameras, etc.
- Installation of security fence, gates, operators and electronics.
- Installation of roof-top defensive guard positions and concealment walls on several plant buildings.
- Demolition of 11 existing buildings.
- Entombment of multiple doorways on the interior of the turbine buildings and the exterior of others.
- Installation of numerous structural steel screens, security cages, and other impairments.
- Installation of CCTV cameras throughout the plant.
- Re-construction of the entrance and exit roads with new guide rail and signage.
- Installation of a new rifle and pistol range with a 40’ tower and automated target system.
- Installation of new active vehicle barrier systems.
- Installation of a new vehicle prescreening area.
- Installation of new site lighting