PSE&G Security Upgrades

Location

Hancocks Bridge, New Jersey

Project Size

1.6 mile

JINGOLI fast-tracked the project's security upgrades required by the NRC at the Salem/Hope Creek Nuclear Plants in Hancock’s Bridge, NJ. The project included:

  • Installation of a 1.6 mile concrete vehicle barrier, 3.5’ high by 10’ wide. Over a mile was cast-in- place and removable precast concrete blocks were used for the balance.
  • Installation of nine new ballistic resistant guard towers, and relocation of others.
  • Installation of 10,000 feet of razor security fence, including underground conduits and wiring necessary to install the associated intruder detection systems, microwaves, cameras, etc.
  • Installation of security fence, gates, operators and electronics.
  • Installation of roof-top defensive guard positions and concealment walls on several plant buildings.
  • Demolition of 11 existing buildings.
  • Entombment of multiple doorways on the interior of the turbine buildings and the exterior of others.
  • Installation of numerous structural steel screens, security cages, and other impairments.
  • Installation of CCTV cameras throughout the plant.
  • Re-construction of the entrance and exit roads with new guide rail and signage.
  • Installation of a new rifle and pistol range with a 40’ tower and automated target system.
  • Installation of new active vehicle barrier systems.
  • Installation of a new vehicle prescreening area.
  • Installation of new site lighting